Barge Works

Waterfront Construction and Earthworks

Waterfront Access

With so many waterfront properties on the Gold Coast and in south east Queensland, access to the foreshore, many sites can only be accessed from the water.

A large number of Alan’s projects are undertaken directly from the water by using our barge. Capable of carrying raw materials and equipment directly to the site, This includes our excavator and bobcat and we are also able to remove debris from the worksite.

The barge enables us to access these properties with minimal or no disruption to the existing infrastructure.

Further Reading:

When Retaining Walls Come Tumbling Down

When Retaining Walls Come Tumbling Down
Author: Alan Davis

Men at work

Excavation of failed revetment wall inc. jackhammering concrete slurry.

Photo shows barge and two excavators being used to relay demolition materials for removal off site.(recycling yard).

VIEW NEXT

Demolition

Excavator demolishing failed retaining wall and placing materials on barge for disposal.

VIEW NEXT

River projects

This photograph shows excavator loading barge on a major river project.

VIEW NEXT

Limited access

With limited access (canal or river frontage) projects can be made easy using our barge. Photograph shows barge and excavator at work.

VIEW NEXT

Bobcat

Gravel being placed behind wall using barge and bobcat.

VIEW NEXT

Material transport

Building materials being transported by our barge on main river project.

VIEW NEXT

Retaining wall

Failed retaining wall only access for demolition and rebuild was by barge.

VIEW NEXT

Before

After

Before

After

Demolition & Rebuild

Due to limited access on this site (main river) all demolition works and total rebuild were done using our barge.

VIEW NEXT

Major projects

Major project main river, total rebuild using excavator and barge due to no access except from river.

VIEW NEXT

Before

After

Piers

Screw piers being placed from our barge.

BACK TO HOME

Call us for a quote

0412 758 059